Рус

Photos of the project's stages

 

Stages of the project

2017, January
2016, July
2016, May
2016, February

 

 

 

Promstroi JSC

Structural subdivision «Tobolsk»

Information about the facility «Construction of temporary rotational camp, field offices and workshop for application of fire retardant paint including general construction and mechanical installation works»

Client: ZapSibNeftekhim LLC (SIBUR)
General Contractor: Promstroi JSC
Beginning of the construction: December 2015
Completion of the construction: December 2017

ZapSibNeftekhim project involves the construction of the temporary rotational camp, field offices and workshop for application of fire retardant paint not far from Tobolsk for implementation of the project «West-Siberian complex of raw hydrocarbons deep conversion into polyolefins which capacity is 2.0 million tons per year, including corresponding off-site facilities».

ZapSibNeftekhim is a part of Tobolsk industrial site that combine operating enterprises of Tobolsk-Neftekhim and Tobolsk-Polimer.

Raw materials (8 million tons of NGL per year) will be delivered by South Balyk – Tobolsk pipeline to the raw materials de-ethanizer of ZapSibNeftekhim, where it is split into its component fractions. There were significantly expanded capacities on gas fractionation of Tobolsk-Neftekhim, there were constructed the NGL pipeline from Purovskiy CPP to Tobolsk-Neftekhim and there was expanded carrying capacity of Denisovka non-public utility station of Sverdlovsk rail road in two times.

The Contract provides performance of general construction, mechanical-installation, electrical-installation and commissioning.

    1. General construction:
  • earthworks
  • piling
  • installation of concrete and reinforced concrete monolithic structures
  • installation of precast concrete and reinforced concrete structures
  • work on arrangement of masonry and reinforced masonry structures
  • finishing work
  • steel frame installation
  • roofing
  • facade works
  • anticorrosion protection and waterproofing of building structures
  • site improvements
  • construction of motor roads
  • construction of railways
  • flame retardance of building structures
    2. Mechanical installation works:
  • installation of production equipment
  • installation of process pipelines
  • anticorrosion protection of pipelines of equipment
  • insulation of pipelines and vessels
  • installation of vertical steel tanks
  • installation of fire fighting systems
  • installation of water supply and sewage system
  • installation of heating system
  • installation of ventilation system
  • laying of free flow sewage conduits
  • laying of flow sewage conduits
  • installation of check valves and sewage network equipment
  • installation of sewer manholes and drain shafts
  • laying of drain pipes
  • heat networks
  • installation systems of gas distribution and gas consumption
    3. Electrical-installation:
  • • installation of cathodic protection
  • • installation of electrical equipment
  • • installation of cable structures
  • • laying of cable products
  • • installation of lightning protection
  • • installation of earthing system
  • • electric power supply for electrical support equipment
  • • electric power supply for in-house needs

4. Commissioning

 

In December 2017 the Certificate of Acceptance of a Completed Facility was signed (Certificate KS-11).

 


 

 

 

 

Promstroi Group
of Companies


 

PROMSTROI-GROUP
JSC

Moscow

 
 

Subsidiaries

 

Promstroi
JSC

Nyagan (KMAD)

 

Spetsializirovannoye
Upravlenie No.6
JSC

Stavropol

 

Uralmontazhavtomatika
OJSC

Tyumen

 

KAZMEKHANOMONTAZH
LLP

Republic of Kazakhstan,
Almaty

 

Novopolotsk Metal
Structures Plant
JV LLC

Republic of Belarus,
Novopolotsk

 

Inzhpromstroi
LLC

Blagoveshchensk

 

Associated
undertakings

Talspetsstroi
LLC

Nyagan (KMAD)