Projects

Since December, 2009 Talspetsstroi Ltd. has been a member of Non-commercial Partnership «NEFTEGAZSTROI» specialized on the construction of oil and gas facilities.
Website of Non-commercial Partnership «NEFTEGAZSTROI»:
http://npngs.ru/
|
Talspetsstroi Ltd.
Nyagan (KMAD)
Region VP (Khanty-Mansiysk Autonomous District – Yugra), Managing Director, Talspesstroi Ltd. - Ramil G. Karimov
Main services
- site preparation and motor roads for oil well drilling
- installation of well pad facilities; minor bridge construction
- gathering pipeline systems construction
- recultivation of sludge pits and well pads after drilling
- surveying, design and development of dry and hydro-wash pits
- sand hydro-wash (has its own sand pits)
Our customers
- TNK-Nyagan OJSC
- Integra-Bureniye Ltd.
- RN Yuganneftegaz Ltd.
- Sibstroikom CJSC
- Building and Construction Company «Lukom» CJSC and etc.
Signature projects
TNK-Nyagan OJSC
- Construction of pad facility No.22 with motor road and bridge (Yem-Yegovskoye pad)
- Construction of pad facility No.141 bis (Talinskaya area)
- Construction of pad facility No.38, 38 bis (Yem-Yegovskaya area)
- Construction of pad facility No. 167,177 (Yem-Yegovskoye area)
- Reconstruction of motor road to pad No.15 (Yem-Yegovskoye area)
- Remediation of sludge pits (Yem-Yegovskoye area)
- Construction of sludge pits (Yem-Yegovskoye area)
- Capital repairs of oil-contaminated wastes polygon (Yem-Yegovskoye area)
- Sand jetting, 2,5 ml. cubic meters
TNK-Nyagan OJSC, Oil and Gas Production Unit “Kamennoye”
- Sand jetting, 2,5 ml. cubic meters
- Construction of pad facility No.32 on Poyma site of Kamennaya area (280 ths. m3 of back filling)
- Construction of motor road, pads No.127-No. 27 on Poyma site of Kamennaya area (110 ths. m3 of back filling);
- Construction of motor road and a pad No.106 of Kamennaya area (90 ths. m3 of back filling)
- Construction of bridge k.106 of Kamennaya area
- Reconstruction of motor road, pad No.18 (Kamennaya area)
- Construction of oil-gathering systems on Poyma site of Kamennaya area (19,5 km)
RN-Yuganskneftegaz LLC
- Facility construction for pipeline transport
RITEK OJSC
- Oil custody metering system near Krasnoleninskaya Oil Pumping Station. Reconstruction.
Trans-oil OJSC
- Reconstruction of motor road and pads
Own resources
Total qualification staff numbers 148 employees, including technical staff (45 employees)
Equipment and transport:
- Motor graders
- Automatic cranes
- Bulldozers (“Caterpillar”, Á-10Ì, Ò-130, Ò-170)
- Tractors
- Diesel power stations -32, -48
- Dredges, communication lines -27, -42
- Loading machines
- Dumping trucks
- Pipe-laying machines
- Excavating machines
- Buses
Total amount of equipment is more than 60 units.
Contact details
30/1, Lazareva St.
Nyagan
Telephone: +7 (34672) 51572
E-mail: tss@promstroi-group.ru
|
Productive
Assets
|